Schuylkill Intermediate Unit 29

Schuylkill

Project Background

The Schuylkill Intermediate Unit 29 hired Reynolds to provide professional services and a domestic hot water engineering study.

Reynolds first performed the domestic hot water study and found several major issues that needed to be addressed immediately. We were awarded the contract to provide the IU with design services for a replacement for the domestic hot water system.

Following the completion of this project, Reynolds was hired to perform a survey of the HVAC system in the Maple Avenue Campus. Since the completion of that survey, Reynolds was hired once again to provide design, bidding, and construction management services for the replacement of the building’s air conditioning system.

SERVICES PROVIDED
• HVAC system survey
• Domestic hot water engineering study
• Design engineering
• Bidding services
• Construction management
• Retro-commissioning

Project Specs

Solution: Energy
Project Cost: $2,500,000