Project Background

Reynolds was hired by Red Rose Transit Authority as construction manager for their Queen Street Station Phase II Project. The project included a 10,000-square-foot expansion of the Lancaster Museum of Art along the 200 block of North Queen Street, the expansion of the existing bus station to link it with East Chestnut Street, and construction of a 395-space parking garage. The garage was built to support the later construction of a 38-unit condominium tower that could rise above it to 16 stories.

Reynolds also managed the preconstruction and construction to the renovations at the authority’s Erick Road administrative and maintenance facility. Upgrades to the 30-year-old facility were designed to make it energy efficient. Plans called for geothermal heating and cooling, skylights, solar panels, a green roof, and a waste-oil burner that converts used oil from RRTA’s fleet of buses into heat for the buildings. Estimates show RRTA’s energy use at the facility could be cut by 75 percent with the changes.

Project Specs

Solutions: Construction Management
Architects: Timothy Haas and Associates, CDM Architects
Square Feet: 17,520 new construction, 13,778 renovations
Construction Cost: $15.1 million

Related Projects

Download Reynolds Restoration Services App!