Project Background

Reynolds first provided services for the completion of hospital-wide refurbishment projects. These were fast-tracked projects that had to be designed, bid, and completed in a six-month period. All projects were completed on-time with coordination around all Medical Center activities.

Reynolds also provided budgeting and preconstruction services for studies performed at the Medical and Animal Research Facilities. Later, Reynolds was awarded an open-ended contract for project management services. Reynolds also completed owner’s representative services for the new 252,000-square-foot Penn State Children’s Hospital.

Since 2000, Reynolds has contracted with the medical center for numerous studies, MEP design engineering projects, and building commissioning projects.

Project Specs

Solutions: Construction | Commissioning & Engineering
Construction Projects:

  • Children’s Hospital (Owner’s Representative)
  • Same Day Admissions Unit
  • PET Suite
  • MRI Suites
  • Radiology Suites
  • Pediatric-Neonatal OR Supersuite
  • Surgical Intermediate Care Unit
  • Orthopedic Rehabilitation Space
  • Neuroscience Intensive Care Unit
  • Oncology Department Office
  • Colorectal/Laparoscopic OR Supersuite
  • Pharmacology Department
  • Ultrasound Procedure Room

Design Engineering Projects:

  • Installation of Two 1,500 Ton Water-Cooled Centrifugal Chillers
  • Satellite Chiller Plant Expansion
  • 5 Mega Watt Central Emergency Generator
  • Extension of Oxygen Piping System
  • Central Chilled Water System (Audit and LEED Documentation)
  • Stainless Steel Condenser Water Piping
  • Kitchen Domestic Water Piping
  • Parking Lot Lighting
  • Laundry Building Lighting
  • ARF Building Dog Run
  • Campus Utility Master Plan
  • UPS Upgrades
  • Communication Building Upgrades
  • Replacement of Emergency Generators
  • IT Data Closets HVAC Survey and Design Engineering
  • Chiller Replacement
  • Steam Line Projects
  • Building Commissioning Projects
  • East Campus Expansion
  • East Chiller Tower Replacement
  • Satellite Chiller Plant